🇬🇧 Select country and language
Polska
Magyarország
Česko
România
Polska
Magyarország
Česko
România
Polska
Magyarország
Česko
România
A solar power plant with energy storage provides additional opportunities for farms. You can now use the energy produced during the hours when the plant is not in operation. You also have the option of buying energy and selling the surplus at times when prices are most favourable.
Today, it’s more important to know when you can use the electricity than how much you produce. That’s why we designed a system that allows you to produce and store energy from the sun, so that you can use it even when the installation is not working, or sell the surplus at the best price.
The system includes:
The 3×0 PLN Lease Loan is a special photovoltaic offer for farmers created by Lerta and BNP Paribas Leasing Solutions.
What does 3×0 PLN mean?
With this offer, you save triple:
I manage the work of advisors all over Poland. I will be happy to discuss the optimal choice of photovoltaic system for your company, forms of financing and integration with other Lerta Virtual Power Plant services to maximise your profits.
The installation of photovoltaic panels was carried out in spring 2020. The implementation was fast and efficient, very good contact with the company. I received all information and answers to my questions.
We always provide a tailor-made design by certified designers with many years of experience gained in Poland and the UK. We include all aspects of the installation, i.e. components, cabling, control and measurement devices, fire protection, possible optimisers if the installation will be subject to partial shading.
Each order is treated individually, we design on the basis of an audit which determines the size of the installation which is the most suitable for the current and planned needs of the customer, which orientation in relation to the directions of the world will be the most beneficial, which components will allow to obtain the highest possible efficiency of the place of installation (on the roof or ground).
We follow procedures which are higher than those required by law with regard to safety, installation and fire regulations. Installations above 40 kWp are optionally examined with a thermal imaging camera in order to detect any possible imperfections in modules or electrical connections.
We’ll call as soon as possible